klar
Hint:

For an area outside of Lower Saxony and foreign languages, some menu items and functions are not available. Please go to the service page of the respective country.

For Citizens

Enter your place of residence or the place where you would like to contact the administration or use the location determination.
Enter one or more keywords related to your search.

Construction Methods

There are 22 services for Construction Methods

The building permit is issued in writing if there are no public regulations to prevent the construction project. It may be possible to exempt people from the building permit...
A construction project may have an impact on the neighbouring plots of the building plot. That is why the Building Code contains numerous provisions to protect neighbours.This...
For some construction measures, a simplified building permit procedure according to Section 63 of the Lower Saxony Building Code (NBauO) has to be carried out, for special...
On behalf of the legislator, the competent authority supervises compliance with public building law. This results in the following tasks: Examining building applications and...
Excavations for cultural monuments, salvageof cultural monuments from water bodies and earthworks at a site where cultural monuments are to be suspected in the ground require...
The regulations of the Lower Saxony Building Code (NBauO) also apply to the removal of structural installations (demolition).With the exception of high-rise buildings or a...
An Environmental Impact Assessment (EIA) is required under the authorisation procedure for a large number of projects where significant environmental impacts are expected. These...
The design permit for flying structures may be extended for a further five years upon request. The extension is granted in the test book.
Flying structures are non-stationary structures that are repeatedly erected and dismantled. An execution permit is required before the first installation and use of flying...
Everyone can see the project and development plan.
Trees and shrubs, distances and habits, sounds, cats, dogs and last but not least, of course, the children: there are many occasions when the neighboring community becomes a...
The construction of certain buildings and other construction facilities in residential areas and industrial areas is possible in individual cases without planning permission and...
The planning approval is a formal administrative procedure for the binding regulatory determination of a plan. All public-law relations between the promoter of the project and...
Before submitting a building application, the client may, with a preliminary request for a building, submit information on individual questions which would have to be decided in...
With the European Year of Monument Protection 1975, the realization has generally become established that the past can only have a future if the built certificates are...
Certain construction and parts of construction installations may be constructed, inserted or modified as procedural works without planning permission and without notification....
In the case of temporary and occasional services, foreign nationals are entitled to build as draftsman if they meet the conditions. The temporary and occasional nature of the...
If one year has elapsed since the last advertisement and the draftsman intends to continue to provide services, this shall be reported to the competent body.
Resident certificates are declarations by the municipality, the municipality and the city about a possible obligation to contribute to development or development services as...
If you want to purchase a plot of land, you can obtain greater financial planning security with a resident certificate. The following levies or contributions may be...
Buildings that characterize the land in a significant and sustainable manner and which are to be regarded as basic information in the interest of the general interest are...
Top of the Page