Change of use of buildings Approval
According to § 60 (2) of the Lower Saxony Building Code (NBauO), the change of use of a building is not subject to proceedings if the public building law does not impose any other or further requirements on the new use.
The change of use does not require a permit if, after the modification has been carried out, the building does not require a permit within the meaning of § 62 NBauO.
Who should I contact?
The responsibility lies with the municipality, the joint municipality and the city. If the building supervisory authority is not itself a building supervisory authority, it forwards the building application to the responsible building supervisory authority within one week.
Responsible authorities
Gemeinde Rhede (Ems) - Hoch-/Tiefbauamt
Timetable
Timetable
recipients: Gemeinde Rhede (Ems)
bank: Emsländische Volksbank
IBAN: DE08266614940000164300
recipients: Gemeinde Rhede (Ems)
bank: Sparkasse Emsland
IBAN: DE06266500010017000019
Contact
- Rhede (Ems):
- Apply for a tree felling permit for municipally protected trees
- Building file archive
- Building permit issuance
- Building permit issuance in the simplified building permit procedure
- Cancel display
- Change of use of buildings Approval
- Confirmation of development
- Damage to roads and bridges: Notification
- Development contributions
- Development plan
- Discharge of waste water into public sewage systems: permit
- Disturbance of street lighting: message
- Granting access to building permits for neighbours
- House number: Fixing
- Land use plan
- Landscape and green space plans
- Permit-free construction measures Notification
- Playgrounds: Maintenance
- Process-free construction measures
- Purchase and sale of land for agricultural or forestry purposes
- Residential plots municipal
- Urban land-use planning
- Rhede (Ems):
- Apply for a tree felling permit for municipally protected trees
- Building file archive
- Building permit issuance
- Building permit issuance in the simplified building permit procedure
- Cancel display
- Change of use of buildings Approval
- Confirmation of development
- Damage to roads and bridges: Notification
- Development contributions
- Development plan
- Discharge of waste water into public sewage systems: permit
- Disturbance of street lighting: message
- Granting access to building permits for neighbours
- House number: Fixing
- Land use plan
- Landscape and green space plans
- Permit-free construction measures Notification
- Playgrounds: Maintenance
- Process-free construction measures
- Purchase and sale of land for agricultural or forestry purposes
- Residential plots municipal
- Urban land-use planning
- Rhede (Ems):
- Apply for a tree felling permit for municipally protected trees
- Building file archive
- Building permit issuance
- Building permit issuance in the simplified building permit procedure
- Cancel display
- Change of use of buildings Approval
- Confirmation of development
- Damage to roads and bridges: Notification
- Development contributions
- Development plan
- Discharge of waste water into public sewage systems: permit
- Disturbance of street lighting: message
- Granting access to building permits for neighbours
- House number: Fixing
- Land use plan
- Landscape and green space plans
- Permit-free construction measures Notification
- Playgrounds: Maintenance
- Process-free construction measures
- Purchase and sale of land for agricultural or forestry purposes
- Residential plots municipal
- Urban land-use planning
Which documents are required?
The required documents are set out in the Building Template Ordinance (BauVorlVO). Essentially, you will need:
- Application form on official form with all necessary signatures
- Description of the establishment (for commercial projects)
- Site plan (if applicable, excerpt from the real estate cadastre)
- Construction drawings with registration of previous and future use
- Calculation of construction numbers such as calculation of living or usable space
- Proof of parking space for additional demand
- Construction description and construction costs (insofar as structural changes are incurred)
If the change of use does not require a permit, the building owner must submit a written notification of the intended change of use to the municipality and attach the documents referred to in § 62 of the Lower Saxony Building Code (NBauO) (essentially the draft).
What are the fees?
Fees may apply, please contact the relevant authority.
Process flow
The change of use - even without structural changes - is subject to a building permit if the public building law imposes different or more far-reaching requirements on the building in the new use. This is usually the case. The procedure is the same as for the approval of new buildings.
In the case of changes of use that lead to the construction becoming a special building in accordance with § 2 (5) of the Lower Saxony Building Code (NBauO), an extensive building permit procedure must be carried out in accordance with § 64 NBauO.
For the remaining changes of use, a simple building permit procedure must be carried out in accordance with § 63 NBauO.
What deadlines do I have to pay attention to?
Deadlines may have to be observed. Please contact the competent authority.
What else should I know?
For the registration, e.g. of a business, it is advisable to find out in advance from the competent authority whether the desired use of a building or a room constitutes a change of use requiring approval.
Legal basis
Author
The text was automatically translated based on the German content.