Notify construction, significant modification or measures involving a change in the hazard level of installations for handling substances hazardous to water (except heating oil consumer installations and JGS installations)


You must submit your notification of the construction, significant modification or change to the hazard level of an installation subject to mandatory inspection to the competent authority in good time in advance.

The construction of these installations does not have to be notified if

  • a suitability assessment has been applied for in accordance with the Water Resources Act for installations for the storage, filling or handling of substances hazardous to water or
  • installations are the subject of an approval procedure under other legislation, provided that the approval procedure also ensures compliance with the requirements of this Ordinance. In this case, significant changes to the installation that require approval are also not subject to notification.

If you want to submit the advertisement online:

  • You submit the notification via the online service.
  • The water authority will check your documents for completeness and request any missing information or documents.
  • The content requirements are also checked, which may also result in additional requirements.
  • The authority can temporarily or permanently prohibit the project or issue a decision with conditions.

If you wish to send the notification by letter or e-mail:

  • You fill out the forms required for the notification and send them to the lower water authority.
  • The further procedural steps correspond to the online procedure.

The systems must comply with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be verified with the documents to be submitted.

  • Completed notification form
  • Detailed documents describing the project (site plan, drawings, certificates, descriptions)
  • Expert opinion, if applicable

Please send your notification to the competent authority at least six weeks in advance.

Lower Saxony Ministry for the Environment, Energy and Climate Protection

06.12.2023

The text was automatically translated based on the German content.

competent Bodies


Staatliches Gewerbeaufsichtsamt Emden
Address: Brückstraße 38 , 26725 Emden
Timetable
Telephone: 04921 9217-0
Fax: 04921 9217-59
Fax: 04921 9217-58

Data protection information


Landkreis Emsland
Address: Ordeniederung 1 , 49716 Meppen
Timetable
Postal address: Post Office Box 15 62 , 49705 Meppen
Timetable
Telephone: 05931 44-0
Fax: 05931 44-3621
Transport Connection:
Station Haltestelle Kreishaus
Bus: 993

Building Access
elevator available, wheelchair-accessible
bank account:
recipients: Landkreis Emsland
bank: Emsländische Volksbank
BIC: GENODEF1LIG
IBAN: DE26266600600120050000
recipients: Landkreis Emsland
bank: Sparkasse Emsland
BIC: NOLADE21EMS
IBAN: DE39266500010000001339
recipients: Landkreis Emsland
bank: Postbank Hannover
BIC: PBNKDEFF250
IBAN: DE36250100300012132306

Ansprechpartner

Marc-André Burgdorf
responsible for:
Bernd Otten (Datenschutzbeauftragter)
Telephone: 05931 44-1605
Fax: 05931 44-391605
Room:
605
responsible for:

Landesbeauftragte für den Datenschutz Niedersachsen
Address: Prinzenstraße 5, 30159 Hannover
Timetable
Telephone: +49 511 12045-00
Fax: +49 511 12045-99

Source: Serviceportal Niedersachsen (Portalverbund des Bundes und der Länder)