Applying for an exemption from the permit requirement for the discharge of wastewater into private wastewater treatment plants


If you want to discharge wastewater into a private wastewater treatment plant, you can be exempted from the permit requirement for wastewater discharge under certain conditions.

For certain sectors and activities (such as the chemical industry, paper production, metal processing, cooling water utilisation), pollutants are to be expected in wastewater that are not sufficiently purified in a municipal wastewater treatment plant. Requirements for this are set out in the sector-specific annexes to the Wastewater Ordinance.

In order to comply with these requirements, special measures and wastewater pre-treatment plants are required to reduce the pollutant load in such a way that the wastewater can then be treated safely in a public or private wastewater treatment plant.

 

Process flow

  • You fill out the application documents and submit them to the competent authority with all the necessary documents.
  • The competent authority will examine your application.
  • If all the necessary requirements are met, your application will be approved.
  • You will be exempt from the permit requirement for the discharge of wastewater into private wastewater treatment plants.

Requirements

You can be exempted from the permit requirement for the discharge of wastewater into a private wastewater treatment plant if you ensure compliance with the legal requirements through a contract with the operator of the private wastewater plant.

Which documents are required?

The required documentation depends on the wastewater (industrial wastewater, commercial wastewater) that is to be discharged into the private wastewater plant.

  • Application
  • Contractual arrangements between the discharger of the wastewater and the operator of the private wastewater treatment plant

What are the fees?

The costs for the exemption from the permit requirement are based on No. 96.1.17.3 of the Annex to the General Schedule of Fees (AllGO).

Appeal

Contradiction

Technically approved by

Ministry of the Environment, Energy and Climate Action

Professionally released on

29.11.2023

Author

The text was automatically translated based on the German content.

Data protection information


Landkreis Emsland
Address: Ordeniederung 1 , 49716 Meppen
Timetable
Postal address: Post Office Box 15 62 , 49705 Meppen
Timetable
Telephone: 05931 44-0
Fax: 05931 44-3621
Transport Connection:
Station Haltestelle Kreishaus
Bus: 993

Building Access
elevator available, wheelchair-accessible
bank account:
recipients: Landkreis Emsland
bank: Emsländische Volksbank
BIC: GENODEF1LIG
IBAN: DE26266600600120050000
recipients: Landkreis Emsland
bank: Sparkasse Emsland
BIC: NOLADE21EMS
IBAN: DE39266500010000001339
recipients: Landkreis Emsland
bank: Postbank Hannover
BIC: PBNKDEFF250
IBAN: DE36250100300012132306

Ansprechpartner

Marc-André Burgdorf
responsible for:
Bernd Otten (Datenschutzbeauftragter)
Telephone: 05931 44-1605
Fax: 05931 44-391605
Room:
605
responsible for:

Landesbeauftragte für den Datenschutz Niedersachsen
Address: Prinzenstraße 5, 30159 Hannover
Timetable
Telephone: +49 511 12045-00
Fax: +49 511 12045-99

Source: Serviceportal Niedersachsen (Portalverbund des Bundes und der Länder)