Petrol stations Advertisement Commissioning: Limitation of the release of fuel vapours
For the construction and operation of a petrol station, you need a permit from the competent authority (if necessary in addition to the building permit).
Permission can be granted subject to conditions and can be restricted, limited in time and subject to conditions at any time.
The notification must be submitted in writing or electronically to the competent authority.
In Lower Saxony, the responsibility lies with the districts, the independent cities and the large independent cities.
Acknowledgment of receipt of a notification and the attached documents:
The amount of the fees is determined – according to Annex 1 to § 1 paragraph 1 of the General Fee Schedule of the State of Lower Saxony No. 44.1.15.1 – depending on the time spent. However, a minimum of EUR 35.00 will be charged.
Checking an ad:
The amount of the fees is determined – in accordance with Annex 1 to § 1 paragraph 1 of the General Fee Schedule of the State of Lower Saxony No. 44.1.15.2 – depending on the time required. However, at least EUR 900.00 will be charged.
The notification must be submitted to the competent authority before the filling station is put into operation.
This administrative service does not constitute an administrative act. For this reason, there is no legal remedy.
Lower Saxony Ministry for the Environment, Energy, Building and Climate Protection
The text was automatically translated based on the German content.