Please enter a search term.
IMPORTANT: Select a location.To obtain application forms, location-specific information and contacts, select a town or zip code.

For an area outside of Lower Saxony and foreign languages, some menu items and functions are not available. Please go to the service page of the respective country.

Please specify an area.

Your selected location: Haselünne (497...)

Which place to enter?

The location is used to determine the responsible office for the selected administrative service. In most cases you can enter your place of residence to find the competent authority. However, there are also cases in which a different location must be specified. Here are some examples:

Birth certificateYou want to get married and need a birth certificate. You live in Hanover, but you were born in Celle. You must therefore state your place of birth, i.e. Celle.

Business registrationYou would like to register a business in Braunschweig. Your place of residence is Hanover. You must therefore state the location of your future business, i.e. Braunschweig.

Apply for a building permitYou would like to build a house in Wunstorf and therefore apply for a building permit. Her place of residence is currently Hanover. You must indicate the place where the house is to be built. In this case it is Wunstorf.

Construction site: Issuing - of construction site orders under traffic law


Work sites that have an impact on road traffic, such as

  • Excavations in the road
  • road construction
  • Work in the side area
  • Erection of scaffolding

must be secured.

Before starting the work, the contractor must obtain instructions from the competent authority (including a traffic sign plan) on how the work site is to be cordoned off and marked and how traffic is to be restricted, regulated and routed.

Who should I contact?

Responsibility lies with the district, the independent city, the large independent city and the independent municipality.

For municipal roads, responsibility can be transferred to the respective municipality, joint municipality and town.

If the approval authority is located within Lower Saxony, the Lower Saxony State Authority for Road Construction and Transport (NLStBV) as the road construction authority for the

  • Federal highways,
  • federal and state roads and
  • the district roads under the technical administration of the state (especially with regard to construction sites and bridge structures)

by the responsible body.

Responsible authorities


Einheitsgemeinde Haselünne, Stadt
Address: Rathausplatz 1 , 49740 Haselünne
Timetable
Postal address: Post Office Box 280 , 49735 Haselünne
Timetable
Telephone: 05961 509-0
Fax: 05961 509-500
Building Access
elevator available, wheelchair-accessible

Contact

Bürgerservice Stadt Haselünne
responsible for:
Address: Ordeniederung 1 , 49716 Meppen
Postal address: Post Office Box 15 62 , 49705 Meppen
Telephone: 05931 44-0
Transport Connection:
Station Haltestelle Kreishaus
Bus: 993
Building Access
elevator available, wheelchair-accessible

Requirements

The traffic law measures required to secure the work site must always be checked on a case-by-case basis. The contractor and the traffic authority have access to the guidelines for securing road works (RSA) as well as standard plans for all possible safety measures.

Which documents are required?

  • written application,
  • Traffic sign plan (either standard plan of the RSA or individual; RSA is the abbreviation for "Richtlinien für die Sicherung von Arbeitsstellen an Straßen")
  • Possibly detour plan

What are the fees?

Fee: 10,20 - 767,00 EUR
Payment in advance: no

Process flow

The contractor must check which road safety measures are necessary and appropriate during the planning phase of the work site based on the specific local conditions. A written application must then be submitted to the traffic authority for the traffic safety measures to be ordered.

The traffic authority examines the application and the documents submitted and consults the authorities to be involved (police and road construction authority). If necessary, a site inspection is carried out with all parties involved in order to coordinate the necessary measures on site. The necessary measures are then ordered by the traffic authority to be carried out by the contractor.

What deadlines do I have to pay attention to?

Deadlines may have to be observed. Please contact the responsible office.

Application Deadline: 2 Weeks
The application must be submitted in good time, at least two weeks before the start of the construction work.

What else should I know?

Roadworks information for Lower Saxony can be found on the Internet on the websites of the Federal Ministry of Transport, Building and Urban Development and the Traffic Management Center.

Information can also be obtained from the traffic authorities of the municipalities and the road and highway maintenance depots of the Lower Saxony State Authority for Road Construction and Traffic.

Source: Serviceportal Niedersachsen (Portalverbund des Bundes und der Länder)