Please enter a search term.
IMPORTANT: Select a location.To obtain application forms, location-specific information and contacts, select a town or zip code.

For an area outside of Lower Saxony and foreign languages, some menu items and functions are not available. Please go to the service page of the respective country.

Please specify an area.

Your selected location: Haselünne (497...)

Which place to enter?

The location is used to determine the responsible office for the selected administrative service. In most cases you can enter your place of residence to find the competent authority. However, there are also cases in which a different location must be specified. Here are some examples:

Birth certificateYou want to get married and need a birth certificate. You live in Hanover, but you were born in Celle. You must therefore state your place of birth, i.e. Celle.

Business registrationYou would like to register a business in Braunschweig. Your place of residence is Hanover. You must therefore state the location of your future business, i.e. Braunschweig.

Apply for a building permitYou would like to build a house in Wunstorf and therefore apply for a building permit. Her place of residence is currently Hanover. You must indicate the place where the house is to be built. In this case it is Wunstorf.

Permit for the extraction of mineral resources: Granting


Anyone wishing to extract mineral resources such as gravel, sand, marl, clay, loam, peat or stone requires a permit from the competent authority if the area to be extracted is larger than 30 m². The permit includes the building permit.

Who should I contact?

Responsibility lies with the district, the Hanover region, the independent city and the large independent city of Celle, Cuxhaven, Hameln, Hildesheim and Lingen (Ems).

Responsible authorities


Einheitsgemeinde Haselünne, Stadt
Address: Rathausplatz 1 , 49740 Haselünne
Timetable
Postal address: Post Office Box 280 , 49735 Haselünne
Timetable
Telephone: 05961 509-0
Fax: 05961 509-500
Building Access
elevator available, wheelchair-accessible

Contact

Bürgerservice Stadt Haselünne
responsible for:
Address: Ordeniederung 1 , 49716 Meppen
Postal address: Post Office Box 15 62 , 49705 Meppen
Telephone: 05931 44-0
Fax: 05931 44-3621
Transport Connection:
Station Haltestelle Kreishaus
Bus: 993
Building Access
elevator available, wheelchair-accessible

Requirements

  • The mining project is compatible with nature conservation law, public building law and other public law.

Which documents are required?

  • The application must be accompanied by:
    • a nature conservation survey of the areas intended for quarrying, including the operational areas and
    • a professionally prepared plan showing all essential details of the extraction project, in particular
      • the location, surroundings and spatial extent of the quarrying operation
      • investigations carried out,
      • the type and method of extraction,
      • the ancillary facilities,
      • the use of the areas used for mining and ancillary facilities after mining,
      • the preparation and utilization of the areas,
      • where necessary, the compensatory and replacement measures,
      • the costs of the compensatory and replacement measures,
      • a schedule for the quarrying and the compensatory and replacement measures.

What are the fees?

Fees are charged in accordance with Annex 1 to Section 1 (1) of the General Fee Regulations of the State of Lower Saxony (AllGO) in accordance with No. 64.2.5.

What deadlines do I have to pay attention to?

The permit expires if mining does not commence within three years of its issue or if mining is interrupted for longer than three years. The period may be extended upon application.

What else should I know?

Further details on the approval procedure under nature conservation law can be found in the circular "Mining of mineral resources" (Nds. MBL. No. 3/2011 p. 41 ff).

If mineral resources within the meaning of Section 3 (3) or (4) No. 1 of the Federal Mining Act (BBergG) are extracted or the extraction takes place underground, a permit for the extraction of mineral resources in accordance with the Federal Mining Act is required.

If a body of water is created, extended or redesigned, the extraction requires a permit under water law.

If a project in accordance with the Annex to the Fourth Ordinance on the Implementation of the Federal Immission Control Act (Ordinance on Installations Requiring a Permit) (4th BImSchV) is carried out for more than 12 months (in particular quarries in which explosives are used or the extraction area covers at least 10 ha), the extraction of mineral resources requires a permit under immission control law.

Author

The text was automatically translated based on the German content.

Source: Serviceportal Niedersachsen (Portalverbund des Bundes und der Länder)