Please enter a search term.
IMPORTANT: Select a location.To obtain application forms, location-specific information and contacts, select a town or zip code.

For an area outside of Lower Saxony and foreign languages, some menu items and functions are not available. Please go to the service page of the respective country.

Please specify an area.

Your selected location: Haselünne (497...)

Which place to enter?

The location is used to determine the responsible office for the selected administrative service. In most cases you can enter your place of residence to find the competent authority. However, there are also cases in which a different location must be specified. Here are some examples:

Birth certificateYou want to get married and need a birth certificate. You live in Hanover, but you were born in Celle. You must therefore state your place of birth, i.e. Celle.

Business registrationYou would like to register a business in Braunschweig. Your place of residence is Hanover. You must therefore state the location of your future business, i.e. Braunschweig.

Apply for a building permitYou would like to build a house in Wunstorf and therefore apply for a building permit. Her place of residence is currently Hanover. You must indicate the place where the house is to be built. In this case it is Wunstorf.

Applying for a permit under immission control law for the construction and operation of systems


Due to their nature or operation, installations can cause harmful environmental effects or otherwise endanger, significantly disadvantage or significantly inconvenience the general public or the neighborhood.

If you want to set up and operate such a facility, you need a permit from the competent authority.

Stationary waste disposal facilities for the storage or treatment of waste are also subject to approval.

Who should I contact?

Responsible authorities


Einheitsgemeinde Haselünne, Stadt
Address: Rathausplatz 1 , 49740 Haselünne
Timetable
Postal address: Post Office Box 280 , 49735 Haselünne
Timetable
Telephone: 05961 509-0
Fax: 05961 509-500
Building Access
elevator available, wheelchair-accessible

Contact

Bürgerservice Stadt Haselünne
responsible for:
Address: Ordeniederung 1 , 49716 Meppen
Postal address: Post Office Box 15 62 , 49705 Meppen
Telephone: 05931 44-0
Fax: 05931 44-3621
Transport Connection:
Station Haltestelle Kreishaus
Bus: 993
Building Access
elevator available, wheelchair-accessible
Address: Theodor-Tantzen-Platz 8 , 26122 Oldenburg (Oldenburg)
Address: Brückstraße 38 , 26725 Emden
Telephone: 04921 9217-0
Fax: 04921 9217-59
Fax: 04921 9217-58

Competent authority

In Lower Saxony, responsibility lies with the state trade supervisory offices, the Hanover region, the districts, independent cities or large independent cities.

Which documents are required?

The ELiA electronic immission control application program is available for permit applications; the required documents can be found in the set of forms stored there. Consultation with the responsible licensing authority before submitting the application is recommended.

Please refer to the guidelines for applicants.

What are the fees?

The fees for licensing procedures under the Federal Immission Control Act are calculated in accordance with Nos. 44.1.1 to 44.1.5 of Annex 1 to Section 1 (1) of the Ordinance on Fees and Expenses for Official Acts and Services (General Fee Schedule - AllGO).

The fees depend, among other things, on the installation costs of the system and are determined in the course of the procedure

Process flow

The approval procedure requires a written application, which must be accompanied by the drawings, explanations and other documents required to check the approval requirements. If the application is complete, it must be published together with the documents and then displayed for one month.

In simplified approval procedures or if public participation is waived, there is no public display and no discussion meeting takes place. At the latest at the same time as the public announcement of the project, the approval authority requests the authorities to be involved to submit their comments on the approval requirements within one month. If there are objections, these can be discussed with you and those who have raised the objections at a public meeting.

Once the licensing authority has determined all the circumstances that are relevant to the granting of a license, a decision on the application must be made - generally within 7 months of the license application being complete, or within 3 months in the simplified procedure. The approval notice must be justified in writing and will be sent to you and the persons who have raised objections. The notification of the approval notice to objectors can be replaced by a public announcement.

What deadlines do I have to pay attention to?

You must apply to the competent authority before installing and operating the system.

Processing duration

A decision on the application for approval must be made within seven months of receipt of the complete application, or within three months in the case of simplified procedures. The competent authority may extend the deadline by three months in each case if this is necessary due to the difficulty of the examination or for reasons attributable to the applicant.

What else should I know?

The ELiA application program can be downloaded free of charge from the website of the Trade Supervisory Authority.

Appeal

Contradiction

Source: Serviceportal Niedersachsen (Portalverbund des Bundes und der Länder)