Demolition display
The regulations of the Lower Saxony Building Code (NBauO) also apply to the removal of structural installations (demolition).
With the exception of high-rise buildings or a part of a building which is not listed in the Annex to the Lower Saxony Building Code (NBauO), the demolition or removal of a building site does not require notification. High-rise buildings or a part of a structural installation not mentioned in the annex to the NBauO must be notified to the competent authority in accordance with Section 60 (3) NBauO.
Irrespective of this, the stability of neighbouring buildings must be checked by the client if they are built together or if the building site gives rise to this.
Process flow
The notification shall be supplemented by a structural planner in accordance with Section 65 (4) of the NBauO on the effectiveness of the intended safety measures and the stability of the structural installations to be demolished or removed. installations or parts of structural installations or whose stability may be affected by the construction project.
Who should I contact?
The responsibility lies with the district, the district-free city, the large independent city as well as the municipality with building supervision powers.
Requirements
Where the removal of the installation requires authorisation, authorisation or approval under other provisions, it must be available before the removal begins. This depends on individual cases, e.g. on monument protection, nature conservation or waste law.
Which documents are required?
Documents may be required. Please contact the appropriate body.
What are the fees?
Fees may apply. Please contact the appropriate body.
What deadlines do I have to pay attention to?
Deadlines may have to be observed. Please contact the appropriate body.
Author
The text was automatically translated based on the German content.
The text was automatically translated based on the German content.
Technically approved by
Lower Saxony Ministry of Social Affairs, Health and Gender Equality