Please enter a search term.

Your selected location: HaselünneFor an area outside of Lower Saxony and foreign languages, some menu items and functions are not available. Please go to the service page of the respective country.

Construction loads: entry - in the construction load list

Construction loads: Building burdens are public-law obligations of landowners and landowners to do, tolerate or omission concerning their land, which do not already result from public law regulations. This will enable the construction or use of another plot of land to be extended.

The construction loads are taken over by written declaration to the building inspectorate. The signature must be publicly certified or provided by a surveying body or before the building inspectorate or recognised before it. Public certification can also be carried out by the municipalities.

Without prejudice to the rights of third parties, the construction loads become effective with the entry in the building load register. Building burdens remain even in the event of the sale of the land, thus also acting against legal successors and legal successors.  

The construction load is covered by a written waiver by the building inspectorate. The waiver shall be declared if there is no longer any public or private interest in the construction load. Before the waiver, the obliged party and the beneficiaries of the construction load shall be consulted. The waiver takes effect with the deletion of the construction load in the construction load register.

Construction load list: The building load list is maintained by the building inspectorate. Other construction obligations of the landowner may also be entered in the register of building loads relating to any action, toleration or omission relating to the property, as well as conditions, time limits and reservations of revocation.

Anyone who expresses a legitimate interest can inspect the building load list and have extracts given to them.

Who should I contact?

The responsibility lies with the district, the district-free city, the large independent city and the municipality with building supervision powers.

Which documents are required?

  • Construction load declaration of the owner
  • Proof of ownership of the land to be incriminated (current land register statement)
  • Map

What are the fees?

The registration and deletion of a building load as well as other entries in the list of construction loads are subject to a fee, as is the issue of extracts. The fee amount is determined according to the Building Fee Regulations (BauGO).

Author

The text was automatically translated based on the German content.

The text was automatically translated based on the German content.

competent Bodies

Landkreis Emsland - Fachbereich Hochbau

Address: Ordeniederung 1 , 49716 Meppen

Postal address: Post Office Box 15 62

Telephone: 05931 44-0
Fax: 05931 44-3621
Transport Connection:
Building Access:
elevator available : yes
wheelchair-accessible : yes
Address: Rathausplatz 1 , 49740 Haselünne

Postal address: Post Office Box 280

Telephone: 05961 509-0
Fax: 05961 509-500
Building Access:
elevator available : yes
wheelchair-accessible : yes

Ansprechpartner

Point of contact:
Bürgerservice Stadt Haselünne
responsible for:

Data protection information

Einheitsgemeinde Haselünne, Stadt

Address: Rathausplatz 1 , 49740 Haselünne

Postal address: Post Office Box 280

Telephone: 05961 509-0
Fax: 05961 509-500
Building Access:
elevator available : yes
wheelchair-accessible : yes

Ansprechpartner

Point of contact:
Bürgerservice Stadt Haselünne
responsible for:

Landkreis Emsland

Address: Ordeniederung 1 , 49716 Meppen

Postal address: Post Office Box 15 62

Telephone: 05931 44-0
Fax: 05931 44-3621
Transport Connection:
Building Access:
elevator available : yes
wheelchair-accessible : yes
bank account:
recipients: Landkreis Emsland
bank: Emsländische Volksbank
BIC: GENODEF1LIG
IBAN: DE26266600600120050000
recipients: Landkreis Emsland
bank: Sparkasse Emsland
BIC: NOLADE21EMS
IBAN: DE39266500010000001339
recipients: Landkreis Emsland
bank: Postbank Hannover
BIC: PBNKDEFF250
IBAN: DE36250100300012132306

Ansprechpartner

Point of contact:
Marc-André Burgdorf
responsible for:
Bernd Otten (Datenschutzbeauftragter)
Telephone: 05931 44-1605
Fax: 05931 44-391605
Room:
605
responsible for:

Landesbeauftragte für den Datenschutz Niedersachsen

Address: Prinzenstraße 5, 30159 Hannover
Telephone: +49 511 12045-00
Fax: +49 511 12045-99
Building Access:
elevator available : unknown
wheelchair-accessible : unknown

Source: Serviceportal Niedersachsen (Portalverbund des Bundes und der Länder)

Further Links

Single points of contact of the state of Lower Saxony, Single points of contact of the countries of Europe, advice and assistance for EU citizens and their families.