Cancellation Indicator
For the removal of structures (demolition), the regulations of the Lower Saxony Building Code (NBauO) also apply.
With the exception of high-rise buildings or a part of a building not mentioned in the annex to the Lower Saxony Building Code (NBauO), the demolition or removal of a structural facility does not require notification. High-rise buildings or a part of a building not mentioned in the annex to the NBauO must be reported to the competent authority in accordance with Section 60 (3) NBauO.
Irrespective of this, the stability of neighbouring buildings must be checked by the client if they are built next to each other or if the subsoil gives rise to this.
Process flow
The notification must be accompanied by a confirmation from a structural engineer in accordance with Section 65 (4) NBauO on the effectiveness of the planned safety measures and the stability of the structures attached to the structures or parts of structures to be demolished or removed, or on the stability of which the construction measure may have an effect.
Who should I contact?
The responsibility lies with the district, the district-free city, the large independent city and the municipality with building authority powers.
Requirements
If the disposal of the installation requires a permit, permit or consent in accordance with other regulations, this must be obtained before removal begins. This depends on the individual case, e.g. according to monument protection, nature conservation or waste law.
Which documents are required?
Documents may be required. Please contact the competent authority.
What are the fees?
Fees may apply, please contact the competent authority.
What deadlines do I have to pay attention to?
Deadlines may have to be observed. Please contact the competent authority.
Technically approved by
Lower Saxony Ministry of Social Affairs, Health and Equality
Author
The text was automatically translated based on the German content.